The ETC power team in Kabul installed a PS pump system on the company's premises. |
||||||||
Water supply for a school centre close to Awasa, Sidamo district. Three PS150 Boost provide 8,000 litres/day of pressurised water for more than 500 pupils. Operated by solar panels and 12 V battery installation. |
||||||||
Installation of a power backup system in Saudi Arabia. |
||||||||



Pump Installation in Kabul, Afghanistan



